{"id":47100,"date":"2021-06-06T12:47:06","date_gmt":"2021-06-06T11:47:06","guid":{"rendered":"https:\/\/derbycyclinggroup.org.uk\/site\/?p=47100"},"modified":"2021-06-28T15:33:27","modified_gmt":"2021-06-28T14:33:27","slug":"chequers-road-cycle-path-now-complete","status":"publish","type":"post","link":"https:\/\/derbycyclinggroup.org.uk\/site\/2021\/06\/chequers-road-cycle-path-now-complete\/","title":{"rendered":"Chequers Road cycle path now complete"},"content":{"rendered":"\n<p>The new cycle path linking Pentagon Island to the new cycle and pedestrian bridge over the A52 near the Wyvern Centre has now been completed. This has been constructed on what was a grass verge between Chequers Road and the A52 and allows cyclists to avoid cycling on Chequers Road which, whilst generally quiet, can have occasional fast and inconsiderate motorists (one Sunday I found 2 hatchbacks doing drag races!).<\/p>\n\n\n\n<p>The surface is generally good and fairly smooth apart from the section near Bamford Auctioneers where a different surface has been used (to cope with tree roots?) and which gives a bumpy ride.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32-1024x768.jpg\" alt=\"\" class=\"wp-image-47103\" srcset=\"https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32-1024x768.jpg 1024w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32-300x225.jpg 300w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32-768x576.jpg 768w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32-1536x1152.jpg 1536w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32-1440x1080.jpg 1440w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.32.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>The signage, on path painting  and tactile paving seem odd but this doesn&#8217;t stop the route being used.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37-1024x768.jpg\" alt=\"\" class=\"wp-image-47102\" srcset=\"https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37-1024x768.jpg 1024w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37-300x225.jpg 300w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37-768x576.jpg 768w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37-1536x1152.jpg 1536w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37-1440x1080.jpg 1440w, https:\/\/derbycyclinggroup.org.uk\/site\/wp-content\/uploads\/2021\/06\/2021-06-05-16.03.37.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Derby City Council&#8217;s news item about this new cycle path can be found <a href=\"https:\/\/www.derby.gov.uk\/news\/2021\/june\/new-cycle-paths-means-better-connections\/\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new cycle path linking Pentagon Island to the new cycle and pedestrian bridge over the A52 near the Wyvern Centre has now been completed. This has been constructed on what was a grass verge between Chequers Road and the A52 and allows cyclists to avoid cycling on Chequers Road which, whilst generally quiet, can&hellip; <a class=\"more-link\" href=\"https:\/\/derbycyclinggroup.org.uk\/site\/2021\/06\/chequers-road-cycle-path-now-complete\/\">Continue reading <span class=\"screen-reader-text\">Chequers Road cycle path now complete<\/span><\/a><\/p>\n","protected":false},"author":135,"featured_media":47101,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-47100","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","entry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/posts\/47100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/users\/135"}],"replies":[{"embeddable":true,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/comments?post=47100"}],"version-history":[{"count":3,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/posts\/47100\/revisions"}],"predecessor-version":[{"id":47108,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/posts\/47100\/revisions\/47108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/media\/47101"}],"wp:attachment":[{"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/media?parent=47100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/categories?post=47100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/derbycyclinggroup.org.uk\/site\/wp-json\/wp\/v2\/tags?post=47100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}